Updates to Fee Configuration

Fee On Top Of Scheduled Fee

The ability to configure a Fee On Top Of Scheduled Fee has been introduced. This provides greater flexibility in fee setup and enables more complex pricing scenarios.  

When Fee On Top Of Fee is triggered by a Scheduled Fee with quantity greater than 1, the Fee Amount will be multiplied by the quantity of the Scheduled Fee. 


Buyrate Configuration

It is no longer possible to configure the Buyrate Gap Payer. Instead, the ability to configure Buyrate Source has been added.  


Previously configured Buyrate Gap Payer are now migrated to the new Buyrate Source configuration. The full Buyrate amount (including any part exceeding the primary fee) is now displayed in reports as Buyrate. For example, if previously a primary fee of $5 and a Buyrate of $8 resulted in Buyrate = $5 and Buyrate Gap = $3, the system will now create a single Buyrate of $8 from the Buyrate Source to the Buyrate Target. 

As a result, fees with Fee Nature = Buyrate Gap will no longer be created. All Buyrate fees will now always have Fee Nature = Buyrate. However, the Buyrate can still be higher than the primary fee. 

The corresponding changes have been made to the Onboarding API. For more details, please refer to our Developer Portal.